AI pre-construction for commercial construction — Office, Retail, Multi-Family, Light Industrial, Municipal, and more.

Join Early Access Download PDF

TeraContext.AI Product Datasheet, page 1 — Turn 1,000+ page RFPs into bids automatically. 60-second spec lookups, 60% faster RFI cycles, 3-5x bid volume per estimator. How it works: Upload, Classify, Package, Review, Bid, Propose. Features for General Contractors include end-to-end pipeline, auto-built scope packages, industry-standard WBS taxonomies, calibrated confidence scores, bid coverage and risk flags, and source provenance. TeraContext.AI Product Datasheet, page 2 — Features for Owner Representatives include scope-coverage dashboards, automated constructability checks, bid-rationale visibility, and change-order risk forecasting, with $1M-$4M in change-order avoidance per major project. Features for Architects and Design Teams include spec-to-drawing reconciliation, natural-language Q&A, constructability flags, and RFI deflection. Closes with Design-Partner Program invitation: info@teracontext.ai.

Datasheet at a Glance

TeraContext.AI ingests construction specifications (500–2,000+ pages) and drawing sets, auto-classifies every section against industry-standard work-breakdown taxonomies, generates subcontractor scope packages, manages bids, and assembles GC proposal responses — with every answer traceable to its source.

How It Works

  1. Upload — Drop in specs, drawings, and addenda. A vision LLM auto-detects each document type.
  2. Classify — Every section is mapped to a WBS taxonomy with a calibrated confidence score.
  3. Package — Trade scope packages are generated automatically, one per WBS division.
  4. Review — Automated constructability and code checks run across rulesets.
  5. Bid — Invite subs, record bids, and compare coverage and risk flags.
  6. Propose — AI assembles the GC response with traceable source citations.

For General Contractors

  • End-to-end pipeline — upload, classify, package, review, bid, and propose in one platform.
  • Auto-built scope packages — one package per division, exportable as CSV, PDF, Word, or Markdown.
  • Industry-standard WBS — 11 industry-standard WBS formats, including UFGS, PennDOT-408, DOE, FERC, EPRI, and NAHB.
  • Calibrated confidence — log-prob confidence scores let estimators bulk-confirm classifications above 90%, typically 70–80% of sections.
  • Bid coverage and risk — coverage percentage, exclusions, alternates, qualifications, and risk flags for every sub response.
  • Source provenance — every answer cites spec section, page, and document version.

TeraContext.AI Review & Classify screen showing a WBS tree with 1,122 classified sections and per-section confidence scores

For Owner Representatives

  • Scope-coverage dashboards — every work-breakdown division mapped, with gaps and overlaps flagged before bidding.
  • Automated constructability checks — trade-by-trade reviews (drywall, electrical, MEP) plus cross-discipline coordination rule sets.
  • Bid-rationale visibility — exclusions, qualifications, and risk flags on every sub response, not just dollar amounts.
  • Change-order risk findings — severity-tagged findings (conflict, ambiguity, missing info, code gap, delegated design) ranked by spread across rulesets.

For Architects and Design Teams

  • Spec-to-drawing reconciliation — a vision LLM reads every drawing sheet (general notes, keynotes, schedules) and cross-references back to spec sections.
  • Natural-language query — “Who is the structural EOR?” “What is the concrete PSI for footings?” — answered with cited spec sections and page numbers.
  • Constructability flags — discrepancies between hardware schedules, partition types, fire ratings, and life-safety requirements surfaced as ranked findings.
  • RFI deflection — run Document Review before issuing, so ambiguities become design clarifications instead of contractor RFIs.

Join the Design-Partner Program

Bring a current RFP. We’ll show you what a fully classified bid set, auto-generated scope packages, and an AI-assembled proposal look like — running on your project, in your environment. Apply for Early Access, download the datasheet PDF, or email [email protected].