Use case

Multi-Taxonomy Classification for Specialty Work

The problem

Your firm bids on DoD projects requiring UFGS classification, Pennsylvania highway work written to PennDOT Publication 408 (PennDOT-408), DOE facilities with their own cost account structure, or power generation projects using FERC or EPRI taxonomies. The standard commercial division format doesn't fit, and manually mapping specs to an unfamiliar taxonomy is slow and error-prone.

How TeraContext.AI handles it

  1. When creating a project, select the appropriate taxonomy: UFGS (DoD), PennDOT-408 (Pennsylvania highway), DOE Nuclear, DOE Buildings, FERC Generation, EPRI GN-COA, NAHB Residential, or one of the other supported formats.
  2. The AI classifies spec sections against your selected taxonomy, using the same confidence scoring and human review workflow.
  3. If none of the 11 built-in standards fit exactly, clone any standard taxonomy and customize it — add, rename, delete, or reorganize codes to match your firm’s internal classification system.
Specs screen showing the spec section tree organized by WBS code, from general requirements through concrete, masonry and metals
The result

One platform handles all your classification needs — commercial, government, highway, power, and residential — without maintaining separate workflows for each.

Early Access program

See this workflow on your own documents

Bring a current RFP and we'll run it through the pipeline with your team.

Get Early Access See How It Works